ICM, Inc. - The Leader In Construction Technology Since 1970
"Your Construction Partner"
             Since 1970
 


 

Ph: (615) 269-0699 keaves@icmmail.com - Kenneth Eaves Fax: (615) 269-0776
  ICM E-Biz Online Store Now Open  
HOME PAGE   SITE MAP CONTACT US COMMENTS BRANCH  LOCATIONS

ABOUT ICM

ICM News Page
Used Equipment
Email ICM
Construction Info
 & Link Page
Employment

Credit Card Form
We Accept

Proper Pipe Jointing
Small Pipe Medium Pipe Large Pipe
Wedge bar against a a wooden block placed horizontally across the bell end of the pipe. Pressure on the bar pushes the pipe into the home position. Mechanical pipe pullers or come along devices are anchored to an installed pipe section several sections back and connected by a cross beam to the section to be installed. By mechanical force, the joint is brought into the home position Joint by placing a dead man blocking inside the installed pipe several sections back from the last installed section. This is connected to a wooden cross beam placed across the bell end of the pipe section being installed by a chain or cable and mechanical pipe puller. By mechanical force the joint is brought into the home position.
Warning:
Shoving pipe sections together with excavating equipment should be avoided unless provisions are made to prevent localized overstressing of the pipe joint.
 
July 24, 2009 Copyright © 2001 ICM EBiz Division.  ebiz@icmmail.com  We Specialize in building Construction Oriented Web Sites