|
GradeStar System -
Guided from Earth's Orbit !
|
|
BACK
NEXT |
|
CALL US AT 501-765-2446 or 501-253-5655
for CURRENT 2D & 3D GPS MACHINE CONTROL
OPTIONS ! |
 |
|
STAKEOUT/ELEVATION DIFFERENCE |
|

 |
Used to stake, grade or check lineally
based projects for applications such as roadways, ditching projects,
airport runways and long distance trenching |
 |
The operator can see his position based on
a cross section of the job, with cut and fill information available
immediately on screen. |
 |
Field Based Grade Checking is a system used
to stake surface geometry based on randomly or regularly spaced points. |
 |
Typical applications would be shopping
centers, landfills, sub divisions, mitigation areas, industrial parks,
recreational areas, golf courses and projects using typical cross
sections. |
 |
Visually the operator can see and
coordinate his position on screen with separate cut/fill indicators
anywhere on the site. |
|
|
SLOPE STAKING |
|

 |
Transitions, cross sections, super
elevations, vertical curves, independent ditch sections and their offsets
are easily and accurately handled. |
 |
Accurately locate and place slope stakes,
offsets, shoulder points, centerline and catch points. |
 |
Slope staking can be user defined. |
 |
On screen slope stake report. |
 |
Story staking ( 2 Point pick ) allow the
office or field personnel complete cross-section information. |
|
|
POINT STORE |
|

 |
Points are graphically located in a design
file. |
 |
Staking is completed in a fraction of the
normal time. |
 |
The operator sees his position numerically
and graphically on screen. |
 |
Points can bee seen on screen to help
determine the best route to complete staking. |
 |
Points are easily recorded into a staking
log for future use or publishing. |
 |
Save up to 80% of the cost of staking and
at a fraction of the time required for conventional methods. |
|
|
TRACKING/CENTERLINE TEMPLATE STAKEOUT |

 | Track and store your current position on the jobsite. |
 | Manually store points with a description. |
|
|
NEXT |